Interior
RV Interior Remodeling and Rebuilds in Placentia, California
RV interior remodeling ranges from a flooring and upholstery refresh to a complete gut and rebuild with new cabinetry, relocated appliances and a changed floorplan. Projects run $1,500 to $50,000 and 20 to 250 hours at $210 per hour. All work happens in-shop in Yorba Linda, about ten minutes from Placentia, where dust control and material staging are practical.
How do you replace a rotted RV subfloor?
The failed area is exposed by pulling flooring, cabinets and often the slide-out room, then cut back to sound material. New subfloor of matching thickness is fitted, bonded and fastened to the floor framing, and any corroded or cracked outriggers underneath are addressed at the same time.
Cutting back far enough is the part that gets rushed elsewhere. Wet luan looks solid an inch beyond the obvious damage and crumbles two inches further, so we probe until the material resists and then cut past that line rather than stopping at the visible stain.
The slide-out floor deserves separate attention. A slide room rolls across the main floor on rollers or slides on a wear strip, so a soft patch under that path will telegraph as a room that drags, tips or fails to seal at the top once it is extended.
Is custom RV cabinetry better than factory replacement parts?
For anything past a like for like door swap, custom is usually the only realistic path. Factory casework for older coaches is discontinued, and even current parts assume a wall that is plumb and square, which almost no RV interior actually is after years of road use.
We template to the actual opening, build in shop, and hang with a scribe so the reveal is even against a wall that leans. That is why an RV cabinet job costs more hours than an equivalent residential run of the same linear footage.
Weight is engineered in as well. Cabinets are built from lighter panel stock with proper hardware rather than residential grade plywood and hinges, because several hundred pounds of over built casework high in the coach changes handling and eats payload capacity.
What happens to appliances and plumbing during a remodel?
They get relocated, replaced or reused depending on condition and the new layout. Moving a galley means rerouting supply and drain lines, moving the twelve volt and one hundred twenty volt circuits, and often relocating the propane line to the range, all of which is done before finish surfaces go in.
Refrigerator swaps are the most common appliance decision in a remodel. Owners frequently move from an absorption Dometic or Norcold to a Furrion or a residential compressor unit, which changes the electrical load and usually means adding inverter and battery capacity to support it.
Water heater and furnace access is planned into the cabinetry rather than discovered afterward. A Suburban or Truma unit needs serviceable access to the burner and controls, and building a beautiful galley that seals a heater behind fixed panels creates a very expensive future service call.
What is included
- Demolition, disposal and hazardous material handling at $45 flat hazmat
- Rotted subfloor cut back and replaced with matched thickness material
- Custom cabinetry templated, built and scribed to the actual coach
- Countertop fabrication in solid surface, laminate or lightweight stone alternatives
- Vinyl plank, laminate or commercial flooring installation with proper transitions
- Upholstery, cushion rebuild and captain chair recovery
- Plumbing, twelve volt, shore power and propane rerouting for layout changes
How the work runs, step by step
- 1
Design and weight review
The new layout is drawn against the existing wall cage, systems runs and axle weight limits before any material is ordered.
1 to 2 weeks
- 2
Demolition and moisture survey
Old finishes come out, the subfloor and wall cavities are probed and metered, and any water path is traced to its source.
3 to 7 days
- 3
Structure and systems rough in
Subfloor and framing repairs are completed, then plumbing, electrical and propane are rerouted and inspected before closing walls.
1 to 4 weeks
- 4
Casework and surfaces
Cabinets are built and scribed in, countertops are templated and fitted, and flooring is installed with proper transitions.
2 to 8 weeks
- 5
Finish, upholstery and function check
Trim, upholstery and hardware go in, then every appliance, circuit and fixture is operated and verified before delivery.
1 to 2 weeks
Questions we get asked
How much does a full RV interior remodel cost?
Can you convert a cargo van into a camper interior?
Do I have to fix the leak before remodeling?
Can I stay in the coach during the remodel?
We Can Help! Contact Us Today.
Bring it to the shop and we will assess the damage, document it properly for your insurer, and tell you exactly what the repair involves. Serving Placentia and the surrounding area from our 35,000 square foot facility.
All work performed in-shop. We stand behind our work.
